Calypso Bay – Stages 2J-S, 7B & KS1

Client
Roche Group
Value
(Confidential)
Period
2024
Location
Jacobs Well, QLD
Expertise
Residential Subdivisions, Road Construction
Back to Projects

Key Features

Calypso Bay project is a canal living development in Jacobs Well, QLD

Delivered by the JK Williams QLD Team, Calypso Bay features 233 residential lots and three significant sites for Stage 2J-S, alongside 19 lots for Stage KS1 and 18 lots for Stage 7B.

Executing this project involved working with sand as the foundational material. Key challenges included preloading the sand with 62,000 cubic meters of fill to facilitate dewatering of the embankments. Additionally, considerations such as the sand’s workability, tidal patterns, water ingress, and the structural integrity of excavated faces were crucial. The project also included the reconstruction of stormwater outlets in active waterways, necessitating sheet piling to manage water levels during high and low tides. A strong emphasis was placed on constructing 71 bio basins along the roadway to effectively filter runoff within the land formation.

Project Highlights:

  • 40,000 cu.m of Strip & Respread Topsoil
  • 62,800 cu.m of Preloaded Earthworks and Unloaded Fill Areas
  • 46,260 sq.m of Pavement Construction
  • 11,500 cu.m of Subgrade Improvement
  • 7,300 lin.m of Kerb
  • 7,500 cu.m of Footpath Construction
  • 270,000 sq.m of Hydromulching
  • 3,000 lin.m of Stormwater Pipe Installation (Salt Water Class) – Ranging from 375mm to 1800mm
  • 3,300 cu.m of Rock Pillow Treatment for Pipelines & Services
  • Demolition and Reconstruction of Revetment Wall in Live Canal Conditions
  • Construction of Overflow Pipes into Existing Revetment Walls
  • 71 Bio Basins Construction along Road Alignment
  • Construction of Vacuum Sewer with Wireless Telemetry
  • Construction of Gravity Sewer, Potable Water, Electrical Reticulation & Communications