Highland Views Stage 8

Client
Highland Views
Value
(Confidential)
Period
2025
Location
Glenmore Park, NSW
Expertise
Landscape & Open Space, Residential Subdivisions, Road Construction
Back to Projects

JK Williams has been proud to deliver multiple stages of the idyllic Highland Views community, located at the foothills of the spectacular Blue Mountains.

Blessed by a tranquil green landscape, and bordered by national parks, reserves and bushlands, all without leaving behind any of the things you love about a contemporary lifestyle. Highland Views is the perfect place to raise a family.

For more information on this exciting community visit highlandviews.com.au

 

Special Features

Highland Views Stage 8A & 8B is a greenfield subdivision located in Glenmore Park. The site was previously farmland which has since undergone subdivision works.

As a part of this 30 Lot Subdivision, the following scope of works was undertaken:

  • Localised Bulk earthworks, inclusive of stripping topsoil, cut to fill and cut to stockpile, topsoil replacement and re-vegetation;
  • Stormwater, inter-allotment and subsoil drainage systems;
  • Road pavements and kerbs
  • Landscaping;
  • Water reticulation and connection to existing watermain;
  • Sewer reticulation and connection to existing sewer;
  • Electrical reticulation, connection to existing HV and LV circuits; and
  • Communications pit and pipe construction.

Included within the Stage 8A & 8B project was the extension of Surveyor’s Creek Landscaping Corridor. This included planting of more than one thousand trees and shrubs of varying specifies, the construction of two fitness stations and the construction of an overland flow concrete shared path which intersects the corridor.

Highland Views