Key Features
The Gables Precinct B Central Stages 1 & 2 is a residential subdivision situated in Box Hill, NSW. This stage was constructed by JK Williams and delivered on an accelerated program.
- 220+ residential lots developed
- 12,100 sq.m of pavement construction, including:
- Subgrade replacement
- Subbase
- Base
- Asphalt
- Significant bulk earthworks, managing existing stockpiles and the importation, placement, and compaction of materials
- 1,690 lin.m of stormwater drainage, featuring pipes up to 600 mm in diameter
- 340 m² of sleeper post retaining walls
- Residential lots filled, trimmed, compacted, and graded
- Infrastructure for:
- Pressure sewer
- Recycled water
- Potable water reticulations
- Electrical and communications reticulations
- Construction carried out in close proximity to community areas and busy roads