Construction of a 144m long bridge connecting Stage 1A of the Calderwood community to the Illawarra Highway.
Calderwood Valley is home to the Macquarie Rivulet which is 23 km in length and runs through the Illawarra escarpment.
Building a bridge over the Macquarie Rivulet brought a range of environmental management processes to ensure there was no impact sustained to the waterway. This bridge a was massive 144 metres long and required a specialist team to manage this project.
Our legacy is that long after we have completed a project, the memory of who we are and what we stand for shall remain.