The Gables Precinct H Stages 5, 6A&B, and Stage 7A&B is a 202 lot residential subdivision delivered ahead of schedule, reducing the program by an impressive 9 weeks.
Construction of a flood mitigation dam
De-silt existing sediment basins and convert into raingardens.