Eastern Creek Raingardens

Client
Jacfin
Value
Confidential
Period
2017
Location
Eastern Creek, NSW
Expertise
Sustainability
Back to Projects

Key Features

Construction of a flood mitigation dam including –

  • Strip topsoil of 33,500 square metres
  • Cut to Fill
  • Construction of clay core embankment
  • Weir Construction
  • Installation of Rocla CDS with Oil Baffle
  • 1km of storm water drainage
  • Over 2,000 square metres of rip rap

Challenge

Construction of the raingardens is to support the flood mitigation controls.

These raingardens are critical to how the flood mitigation is managed for the Industrial Estate surrounding this project, It is important this project was designed for future growth in the area.