Key Features
Construction of over 525 residential lots to date, multiple parks and open spaces, all infrastructure installation, road construction and working within heritage, environmentally and aboriginal sensitive.
Stage 5 and 6 – $1.3 Million
- Civil works complying to disability building codes and standards (AS1428)
- Detail trimming of 300 square metres lots
- 11,500 cubic metres of earthworks
- 850 lineal metres of stormwater drainage
- 2,600 square metres of road works
- Services reticulations (Sewer, water, electrical & NBN)
- 210 square metres of retaining walls
Mountainview Gallery – $6.18 Million
- 138 Lot Residential Subdivision
- Strip topsoil of 14,385 cubic metres
- Cut to Fill of 45,163 cubic metres
- Construct 2,017 lineal metres of Storm water drainage
- Construction of retaining walls
- Construct 14,000 square metres of new roads
- Trim & Pave 19,720 square metres of Footpaths
Belmont Precinct 2A – $8.5 Million
- 73 Lot Residential Subdivision
- Strip topsoil of 92,116 square metres
- Cut to Fill of 59,600 cubic metres
- Construct 2,230 lineal metres of Storm water drainage
- Construction of Rock walls
- Construct 18,500 square metres of new roads
- Construct Twin Headwalls 2700×900 (cast -in situ)
- Placement of over 4,000 lineal metres of subsoil drainage
- Construction of two new intersections under live traffic conditions 35,700 square metres of turf laid in streetscapes and open spaces with irrigation
- Lay over 1.5km of lead in sewer mains for Sydney Water
- Dewatering, desilting and decommissioning of 3 full body dams
Yeomans Stages 5A, B and C – $20.1 Million
- 196 Lot Residential Subdivision
- Strip topsoil of 212,103 square metres
- Cut to Fill and stockpile of 335,000 cubic metres
- Construct 4,185 lineal metres of Storm water drainage up to twin 1200mm diameter
- Installation of 121 Stormwater pits and 3 CDS units
- 215 squarem metres of culvert slabs poured
- Construction of over 1,700 square metres of sandstone Rock walls
- Construct 39,800 square metres of new roads
- Trimmed to tolerance 156,018 square metres of lots
- 7,900 lineal metres of kerb and gutter poured
- 11,273 square metres of pedestrian footpath slip formed
- 51,550 square metres of turf installed with irrigation systems
- Over 750 trees planted in the streetscape and open spaces
- Construction of open space playground
- Dewatering, desilting and decommissioning of 3 full body dams
- Construction of Sydney Water approved IOP Sewer storage
Kingsford Smith Village – $1.6 Million
- 32 Lot Subdivision for Retirement Village
- Strip topsoil of 2,469 cubic metres
- Cut to Fill of 1,970 cubic metres
- Cut to Stockpile of 15,000 cubic metres
- Construct Storm water drainage
- Construct 1,500 square metres of new roads
- Construct Key stone walls
Grose Vale Road Roundabout and Stages 6A and B – $2.9 Million
- Construction of roundabout under heavy live traffic with 12 TCP phase shifts to maintain two directional flow of traffic
- Implementation of new pavement with a 1.95m level difference 10,000 cu.m of cut to fill from the intersection
- Rejuvenation of 5,500 square metres of pavement
- Lowering of live optic fibre to match in with new design levels
- 4,850 square metres of turf installed
Yeomans Entry Road and Subdivision – $8.9 Million
- 56 lot residential subdivision
- Dewater, desilt and modify one dam which was deemed as a prescribed dam by the Dam Safety Committee including a bentonite liner
- 136,270 square metres of topsoil stripping completed
- Cut to fill and stockpile of 184,000 cubic metres
- 1,215 lineal metres of Stormwater installed in the project
- 2 CDS units installed one to a depth of 8.5m
- Construct chimney drain from the prescribed dam wall to promote low flow conditions
- 13,750 square metres of new pavement constructed
- 300 square metres of sandstone log walls built including the modification of existing walls
- 40,100 square metres of topsoil ameliorated and turfed with irrigation systems installed
- 719 trees installed within the landscaping works
Ploughmans Stage – $3.2 Million
- 30 lot residential subdivision
- Tree clearing under Ecologist supervision
- Works adjacent to Aboriginal and Heritage Sensitive areas
- 58,800 square metres of topsoil stripping completed
- Earthworks of 12,000 cu.m
- 858 lineal metres of Stormwater installed in the project and GPT Unit
- 6,248 square metres of new road pavement
- 4,936 square metres of sealed fire trails
- 717 square metres of sandstone log walls built including the modification of existing walls