Redbank

Client
Redbank Communities
Value
$52.68 Million
Period
2016-2020
Location
North Richmond, NSW
Expertise
Residential Subdivisions
Back to Projects

Key Features

Construction of over 525 residential lots to date, multiple parks and open spaces, all infrastructure installation, road construction and working within heritage, environmentally and aboriginal sensitive.

Stage 5 and 6 – $1.3 Million

  • Civil works complying to disability building codes and standards (AS1428)
  • Detail trimming of 300 square metres lots
  • 11,500 cubic metres of earthworks
  • 850 lineal metres of stormwater drainage
  • 2,600 square metres of road works
  • Services reticulations (Sewer, water, electrical & NBN)
  • 210 square metres of retaining walls

Mountainview Gallery – $6.18 Million

  • 138 Lot Residential Subdivision
  • Strip topsoil of 14,385 cubic metres
  • Cut to Fill of 45,163 cubic metres
  • Construct 2,017 lineal metres of Storm water drainage
  • Construction of retaining walls
  • Construct 14,000 square metres of new roads
  • Trim & Pave 19,720 square metres of Footpaths

Belmont Precinct 2A – $8.5 Million

  • 73 Lot Residential Subdivision
  • Strip topsoil of 92,116 square metres
  • Cut to Fill of 59,600 cubic metres
  • Construct 2,230 lineal metres of Storm water drainage
  • Construction of Rock walls
  • Construct 18,500 square metres of new roads
  • Construct Twin Headwalls 2700×900 (cast -in situ)
  • Placement of over 4,000 lineal metres of subsoil drainage
  • Construction of two new intersections under live traffic conditions 35,700 square metres of turf laid in streetscapes and open spaces with irrigation
  • Lay over 1.5km of lead in sewer mains for Sydney Water
  • Dewatering, desilting and decommissioning of 3 full body dams

Yeomans Stages 5A, B and C – $20.1 Million

  • 196 Lot Residential Subdivision
  • Strip topsoil of 212,103 square metres
  • Cut to Fill and stockpile of 335,000 cubic metres
  • Construct 4,185 lineal metres of Storm water drainage up to twin 1200mm diameter
  • Installation of 121 Stormwater pits and 3 CDS units
  • 215 squarem metres of culvert slabs poured
  • Construction of over 1,700 square metres of sandstone Rock walls
  • Construct 39,800 square metres of new roads
  • Trimmed to tolerance 156,018 square metres of lots
  • 7,900 lineal metres of kerb and gutter poured
  • 11,273 square metres  of pedestrian footpath slip formed
  • 51,550 square metres of turf installed with irrigation systems
  • Over 750 trees planted in the streetscape and open spaces
  • Construction of open space playground
  • Dewatering, desilting and decommissioning of 3 full body dams
  • Construction of Sydney Water approved IOP Sewer storage

Kingsford Smith Village – $1.6 Million

  • 32 Lot Subdivision for Retirement Village
  • Strip topsoil of 2,469 cubic metres
  • Cut to Fill of 1,970 cubic metres
  • Cut to Stockpile of 15,000 cubic metres
  • Construct Storm water drainage
  • Construct 1,500 square metres of new roads
  • Construct Key stone walls

Grose Vale Road Roundabout and Stages 6A and B – $2.9 Million

  • Construction of roundabout under heavy live traffic with 12 TCP phase shifts to maintain two directional flow of traffic
  • Implementation of new pavement with a 1.95m level difference 10,000 cu.m of cut to fill from the intersection
  • Rejuvenation of 5,500 square metres of pavement
  • Lowering of live optic fibre to match in with new design levels
  • 4,850 square metres of turf installed

Yeomans Entry Road and Subdivision – $8.9 Million

  • 56 lot residential subdivision
  • Dewater, desilt and modify one dam which was deemed as a prescribed dam by the Dam Safety Committee including a bentonite liner
  • 136,270 square metres of topsoil stripping completed
  • Cut to fill and stockpile of 184,000 cubic metres
  • 1,215 lineal metres of Stormwater installed in the project
  • 2 CDS units installed one to a depth of 8.5m
  • Construct chimney drain from the prescribed dam wall to promote low flow conditions
  • 13,750 square metres of new pavement constructed
  • 300 square metres of sandstone log walls built including the modification of existing walls
  • 40,100 square metres of topsoil ameliorated and turfed with irrigation systems installed
  • 719 trees installed within the landscaping works

Ploughmans Stage – $3.2 Million